Mumbai is a Metropolitan city famous for its elite infrastructure, commercial and residential projects, and ever-bustling lifestyle. Hence, the metro station is an integral part of Mumbai residents. The new Mumbai metro line supports the busy and fast-paced urban lifestyle by making commuting economical, hassle-free, and quick for everyone. Due to consistent growth in Mumbai’s population and lifestyle upgrades, several metro route projects are under construction and approved to be a part of Mumbaikars’ lifestyle. In this article, let’s explore the operational, ongoing, and upcoming new Mumbai metro lines.
The Innovative New Mumbai Metro Route
Various factors, such as infrastructure, speed, and distance coverage, differentiate metro stations from local railways. The Mumbai metro line is designed to make city-wide commutes to various localities easier and less time-consuming. Moreover, the Mumbai metro line reduces traffic congestion on roads. Before exploring the Mumbai metro lines and their development, let’s explore why the idea of a metro route became an immediate hit:
1) Economical:
Metro stations are economical for their low travel fares compared to other public transportation. Moreover, the new Mumbai metro line helps people with no private vehicle cover long distances at reasonable rates.
2) Sustainable:
New Mumbai metro stations are not fossil-fuel-based transport. This mode of transport is sustainable and ensures low carbon emissions. Additionally, In a highly-populated region like Mumbai, it promotes mass transit, reducing traffic congestion and pollution by private vehicles.
3) Time saver:
Besides its eco-friendly operation, Mumbai’s metro routes also save time by offering an average speed of 33 km/h (21 mph). Most Mumbai metro routes have a top speed of up to 80 km/h.
Operational, Ongoing, and Approved Mumbai Metro Stations
While the ownership, construction, and maintenance of the new Mumbai metro route come under the Mumbai Metropolitan Region Development Authority (MMRDA) and Maha Mumbai Metro Operation Corporation Limited, some new metro lines in Mumbai are jointly owned and operated by other organizations, like Reliance Infrastructure Limited, MMRC, and CIDCO. With an average speed of 33 km/h (21 mph), Metro’s new route in Mumbai witnesses a daily ridership of approx. 5,50,000 on average. As of now, it has 3 operational, 5 under construction, and 6 approved Mumbai metro lines.
No. | Mumbai metro line name | Terminal | Line length | Stations | Status |
---|---|---|---|---|---|
1 | Line 1 (blue) | Versova-Ghatkopar | 10.81 km | 12 | Operational |
2 | Line 2 (yellow) | Dahisar East-Mandala | 18.589 km | 17 | Operational |
3 | Line 7 (red) | Dahisar East-Gundavali | 16.5 km | 14 | Operational |
4 | Line 3 (blue) | Colaba–Bandra-SEEPZ line | 33.5 km | 28 | Under construction |
5 | Line 4 (green) | Gaimukh and Kasarvadavali, Wadala | 32.32 km | 34 | Under construction |
6 | Line (orange) | Kapurbawdi-Kalyan APMC | 24.9 km | 17 | Under construction |
7 | Line 6 (pink) | Swami Samarth Nagar (Lokhandwala)-Vikhroli EEH | 14.477 Km | 13 | Under construction |
8 | Line 9 (red) | Dahisar (East)-Mira-Bhayander | 11.386 km | 10 | Under construction |
9 | Line 8 (Gold) | CSMIA – NMIA (Airports) | 35 km | 8 | Approved |
10 | Line 10 (Green ) | Gaimukh (Thane) Shivaji Chowk (Mira Road) | 9km | 4 | Approved |
11 | Line 11 (Green ) | Wadala-CST | 12.6km | 10 | Approved |
12 | Line 12 (Orange) | Kalyan-Taloja | 20.7km | 18 | Approved |
13 | Line 13 (Purple ) | Mira Road-Virar | 23km | 20 | Approved |
14 | Line 14 (Magenta) | Kanjurmarg- Ambernath-Badlapur | 45km | 40 | Approved |
The New Metro Line in Mumbai
Mumbai is known as one of the biggest Metro cities of India. Everyone uses the new Mumbai metro line for travel, from students to corporate employees to families and tourists. Currently, the city has three operational Mumbai metro lines with a total of 45 metro stations, covering various prominent areas of the city and operating since 2014. You can check out the new Mumbai metro map to analyze their area coverage better. Let’s understand the operational metro stations of Mumbai in detail:
1) Line 1 (blue):
With a track length of 11.40 km, this fully elevated Mumbai metro line comprises 12 stations. This Mumbai suburban railway was designed to connect Mumbai’s eastern and western parts. It is Mumbai’s first metro route project, owned and operated by Reliance Infrastructure Limited and Mumbai Metropolitan Region Development Authority (MMRDA), with a vision to connect all the regions between Versova and Ghatkopar. It has 12 stations accessible by escalators, elevators, and staircases. Moreover, this railway has the highest daily ridership in Mumbai, boasting a 99.9% punctuality rate. This Mumbai metro line is also connected with Mumbai’s other metro routes, such as lines 2, 3, and 7. The following table covers the stations under the new Mumbai metro line 1.
No. | Metro station name |
1 | Versova |
2 | D.N. Nagar |
3 | Azad Nagar |
4 | Andheri |
5 | Western Express Highway |
6 | Chakala (J.B.Nagar) |
7 | Airport Road |
8 | Marol Naka |
9 | Saki Naka |
10 | Asalpha |
11 | Jagruti Nagar |
12 | Ghatkopar |
2) Line 2 (yellow):
New Mumbai metro Line 2, also known as the yellow metro route, runs between Dahisar East and Mandale. Operating since April 2022, it boasts an 18.589 km length, 17 elevated stations, smart infrastructure, and a promise of more excellence with the completion of its extension, line 2B. Prime Minister Narendra Modi inaugurated the new section of the metro route from Dahanukarwadi to DN Nagar this year in January. Each train set of this metro comprises six coaches, ensuring a passenger capacity of 1,660. Its extension railway projects comprise more innovative and smartly equipped interiors with longer coverage. The following table covers the stations under the new Mumbai metro line 2.
Metro station name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
3) Line 7 (Red):
While the extension of Mumbai’s new metro route line 7 is under construction, this new metro line in Mumbai operates 15 stations efficiently between Dahisar East and Gundavali. It is 16.5 km long, covering various top localities of Mumbai and serving a daily ridership of 212,000 (on average). Each train set is 3.2 meters wide, comprising stainless steel fittings, four doors on each side, and a regenerative braking system. In addition, its 16th metro station is under construction. The following table covers the stations under the Mumbai metro line 7 and the metro’s new route.
Metro Station name |
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
|
Mumbai’s New Metro Route: Under Construction Metro Lines
While the city has three operational Mumbai metro railway stations, the residents will soon have access to 5 other under-construction lines, most of which are expected to be accessible by 2025. The New Mumbai metro map will soon feature these new metro routes in Mumbai.
The details of these 5 new Mumbai metro lines are as follows;
1) Line 3 (Aqua):
Mumbai citizens will be able to use Aqua Line 3 by 2024. It will be Mumbai’s first underground Metro new route covering top localities from the Cuffe Parade business district in the south to SEEPZ in the north-central region of Mumbai. With 27 underground and 1-grade stations, this 33.5 km long new Mumbai metro line offers direct connectivity to the various business hubs, monorails, educational institutes, and international airport terminals. The following table covers the stations under the Mumbai metro line to help you explore the new metro route.
Metro station names |
|
2) Line 4 (green):
The most awaited Mumbai metro line, connecting Mumbai and Thane from Wadala to Kasarvadavali, is expected to open by the end of 2025. It has a 32.32 km length and elevator access at all its Mumbai metro stations. This Mumbai new metro route project, started in 2016, comprises 34 stations. Its salient features include interconnectivity among the Eastern Express Roadway, Central Railway, Mono Rail, Mumbai Metro Line 2B, 5, and 6. The following table covers the stations under the new Mumbai metro line 4.
Metro Station names |
|
3) Line 5 (Orange):
Line 5 of the Mumbai metro railway station hub has a 24.9 km length, comprising 17 Mumbai metro stations from Kapurbawdi to Kalyan APMC. This meticulously designed futuristic metro new route railway line aims to reduce travel time by 75%. It is owned by (MMRDA) and may operate in the next 2 years. This new metro route will have both elevated and underground Mumbai metro stations. The following table covers the stations under Mumbai metro line 5.
Station names |
|
4) Line 6 (pink):
Line 6 of the Mumbai Metro line project has a 14.47 km length, 13 exceptionally designed elevated metro stations, and world-class infrastructure. This new Mumbai metro route will support commute facilities from Swami Samarth Nagar (Lokhandwala) to Vikhroli. Like the above two metro railway lines, it will also operate in 2025. The following table covers the stations under the Mumbai metro line 6.
Station names |
|
5) Line 9 (red):
Mumbai’s Metro Line 9 will cover prominent areas between Dahisar and Mira-Bhayander through its 12 elite-quality stations. The 12 stations of this new Mumbai metro route include two interchanging stations, i.e., MBMC Sports Complex and Indralok. The following table covers the stations under Mumbai metro line 3.
Station names |
|
Approved Mumbai Metro Lines: New Metro Route in Mumbai
Under the efforts of Maha Mumbai Metro Operation Corporation Limited, the city will soon work on the next phase of Mumbai metro line development that involves innovative and superior railway designs. The government has already approved 6 Mumbai Metro line projects, such as:
1) Line 8 (Gold):
This Mumbai new metro route is known as the Airport Express line project because it connects CSMIA Airport in Mumbai to NMIA Airport in Navi Mumbai. It will be 35 km long with 8 fully-elevated metro stations. MMRDA and CIDCO will operate this new Mumbai metro line’s sophisticated and innovative design.
2) Line 10 (Green):
The foundation stone for Mumbai Metro new route Green Line 10 has been led by Prime Minister Narendra Modi this year. Its construction proposes a 9.2 km long line, covering various areas between Gaimukh and Shivaji Chowk (Mira Road). This Mumbai metro line is an extension of line 4, consisting of four elevated stations, and its construction may be completed by 2030.
3) Line 11 (Green):
This 12.6 km long metro line in Mumbai will make travel faster from Wadala to CST. Incorporating the master plan proposed by DMRC, the completion of this project is expected within 3-4 years. This extended Mumbai metro line project connects passengers with lines 3, 4, and 7. It has three elevated and eight underground stations.
4) Line 12 (Orange):
The orange Mumbai metro station is also an extension of the other Mumbai metro line projects. It will connect Navi Mumbai and Thane from Kalyan to Taloja. This new Mumbai metro line comprises 20.7 km long and 18 elevated stations.
5) Line 13 (Purple):
Mumbai Metro line 13 will make travel easier from Mira Road to Virar through its 20 efficient stations. A budget of around Rs. 6900 crores will be spent on this Mumbai metro line project to facilitate citizens with top-notch railway services and advanced design.
6) Line 14 (Magenta):
Line 14 is going to be Mumbai’s one of the most outstanding metro new route, utilizing a budget of 13,500 crore. The Mumbai metro line will reduce the current travel time from Kanjurmarg to the Ambernath-Badlapur region. This 45 km Mumbai metro station is expected to be operational by 2027.
Bottom Line
The metro plan of Mumbai comprises metro new route trains that run on alternative electric current and cost a minimum ticket fare of rs. 20 on average. Therefore, it is the most sustainable and economical public commute solution for Mumbaikars. If you are planning to move to Mumbai, choosing a locality that offers metro connectivity is wise. You can find elite residential projects with Mumbai’s new metro route access in Mumbai at Asmita India Realty. They offer residential and commercial spaces in contemporary design while ensuring you get quick access to the metro line in Mumbai.
Frequently Asked Questions
1) How many metro stations does Mumbai have?
As of now, there are 55 operational metro stations in Mumbai. 12 stations in Mumbai Metro line 1 (blue), 17 in line 2 (yellow), and 16 in line 7 (red). 5 Metro routes in Mumbai are under construction, comprising over 100 stations, while 6 metro new route projects have been approved.
2) Is there any railway station near Mira Road, Mumbai?
Line 10 and Line 9 are the Mumbai metro lines under construction, which will soon provide a quick and direct Mumbai metro new route from Mira Road. There are various railway stations such as Mira Road Railway Station and Dahisar railway station for commuting.
3) Are the Mumbai metro new routes safe and economical?
Mumbai ranks 6th in the longest-operating Metro route network in India. The average ticket charge will cost anything between 10 to 80 rupees for a single journey, depending on the distance. The Mumbai metro line has well-designed and frequently inspected infrastructure with proper hygiene maintenance. There is proper management to help passengers with any inconvenience. Mumbai metro stations are undoubtedly safe and economical for public transport.